{"id":1320,"date":"2014-03-06T16:11:02","date_gmt":"2014-03-06T16:11:02","guid":{"rendered":"http:\/\/www.adoptaocasa.ro\/?p=1320"},"modified":"2014-05-27T23:16:47","modified_gmt":"2014-05-27T23:16:47","slug":"1248-raport2013","status":"publish","type":"post","link":"https:\/\/www.adoptaocasa.ro\/hu\/rapoarte\/1248-raport2013","title":{"rendered":"(RO) Campania Adopt\u0103 o Cas\u0103 2013 \u2013 raport de activitate Casa 1248"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-hu\">Sajnos ennek a bejegyz\u00e9snek csak <a href=\"https:\/\/www.adoptaocasa.ro\/ro\/wp-json\/wp\/v2\/posts\/1320\" class=\"qtranxs-available-language-link qtranxs-available-language-link-ro\" title=\"RO\">Rom\u00e1n<\/a> nyelv\u0171 v\u00e1ltozata van.<\/p><p><\/p>\n<p align=\"left\">Lucr\u0103rile s-au concentrat \u00een direc\u021bia realiz\u0103rii infrastructurii \u0219i a lucr\u0103rilor prioritare \u2013 finalizarea zidului pr\u0103bu\u0219it, ridicarea construc\u021biei pe zidul ref\u0103cut (structura de lemn era alunecat\u0103 \u0219i \u00eenclinat\u0103) \u0219i preg\u0103tirea lucr\u0103rilor pentru realizarea acoperi\u0219ului.<\/p>\n<table border=\"1\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td valign=\"top\"><\/td>\n<td colspan=\"3\" valign=\"top\">\n<p align=\"left\"><strong>Capitolele de lucr\u0103ri propuse pentru finan\u021bare \u2013 Raport 2013<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\"><b>\u00a0<\/b><\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\"><b>Materiale<\/b><\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\"><b>observa\u021bii<\/b><\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\"><strong>sursa de finan\u021bare\/procurare materiale, manoper\u0103, voluntari<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\"><b>II.<\/b><\/p>\n<\/td>\n<td colspan=\"3\" valign=\"top\">\n<p align=\"left\"><b>Remontarea pere\u0163ilor, grinzilor, \u015farpantei<\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">1.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">zid\u0103rii (finalizare zid pr\u0103bu\u0219it, zid de fa\u021bad\u0103 \u2013 demontat local \u0219i rezidit)<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; zidul lateral a fost finalizat<\/p>\n<p align=\"left\">&#8211; col\u021bul dinspre fa\u021bad\u0103 nu a fost finalizat<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211; AoC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">2.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">reconstituire bolt\u0103 pivni\u021b\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrarea nerealizat\u0103. Lucr\u0103rile de rezidire ale zidului lateral \u0219i ridicarea construc\u021biei pe zid a necesitat mai mult timp de lucru<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">3.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">decopertare tencuieli<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrare nerealizat\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">4.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">repara\u021bii b\u00e2rne (\u00eenlocuire tronsoane, refacere \u00eembin\u0103ri, demont\u0103ri)<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrare nerealizat\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\"><b>III.<\/b><\/p>\n<\/td>\n<td colspan=\"3\" valign=\"top\">\n<p align=\"left\"><b>Refacerea \u00eenvelitorii din \u015findril\u0103 pe suport (astereal\u0103) din sc\u00e2ndur\u0103; introducerea hidroizola\u0163iei<\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">1.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">desfacere acoperi\u0219, desfacere anex\u0103-cuptor<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrare realizat\u0103 par\u021bial<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211; AoC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">2.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">repara\u021bii \u0219arpant\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrare nerealizat\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">3.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">suport \u00eenvelitoare<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrare nerealizat\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">4.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">\u00eenvelitoare din \u0219indril\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; \u0219indrila a fot realizat\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211; montajul va fi realizat la \u00eenceputul acestei campanii<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\"><b>V.<\/b><\/p>\n<\/td>\n<td colspan=\"3\" valign=\"top\">\n<p align=\"left\"><b>Repararea sau realizarea finisajelor, t\u00e2mpl\u0103rii recondi\u0163ionate<\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">1.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">t\u00e2mpl\u0103rii \u2013 recondi\u021bionare, refacere dup\u0103 model existent<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrare nerealizat\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">2.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">finisaje \u2013 tencuieli<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrare nerealizat\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211; var, nisip procurat<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">3.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">finisaje interioare \u2013 podele sc\u00e2ndur\u0103, c\u0103r\u0103mid\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrare nerealizat\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\"><b>IV.<\/b><\/p>\n<\/td>\n<td colspan=\"3\" valign=\"top\">\n<p align=\"left\"><b>Refunc\u0163ionalizare \/ instala\u021bii, introducerea unei b\u0103i, amenajarea unei buc\u0103t\u0103rii \u015fi a unui spa\u0163iu de luat masa (anex\u0103). <\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">1.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">sobe, co\u0219<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrarea nerealizat\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">2.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">instala\u021bii electrice<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrarea nerealizat\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">3.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">funda\u021bie baie \u2013 s\u0103pare \u0219an\u021b<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrare finalizat\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211; AoC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">4.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">funda\u021bie baie \u2013 zid\u0103rie seac\u0103 sau cu mortar de var<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrare finalizat\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211; AoC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">5.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">repara\u021bii mauri \u2013 zid\u0103rie seac\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrarea nerealizat\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">6.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">ziduri din b\u00e2rne, \u0219arpant\u0103 lemn<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrarea nerealizat\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">7.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">suport \u00eenvelitoare<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrarea nerealizat\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">8.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">\u0219indril\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrarea nerealizat\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">9.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">instala\u021bii sanitare<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrarea realizat\u0103 par\u021bial \u2013 conducta de canalizare<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211; AoC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">10.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">instala\u021bii electrice<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrarea nerealizat\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">11.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">t\u00e2mpl\u0103rii<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrarea nerealizat\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">12.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">sobe, co\u0219<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrarea nerealizat\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">13.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">finisaje \u2013 podea umed\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrarea nerealizat\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">14.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">finisaje \u2013 tencuieli (pe cercuial\u0103)<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrarea nerealizat\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\"><b>VII.<\/b><\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\"><b>Amenajare exterioar\u0103-infrastructur\u0103<\/b><\/p>\n<\/td>\n<td valign=\"top\" width=\"157\"><\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\"><b>\u00a0<\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">1.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">repara\u021bie maur vale de \u0219teampuri<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrarea nerealizat\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">2.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">repara\u021bie maur grajd<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrarea nerealizat\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">3.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">repara\u021bie fos\u0103 grajd \u2013 ad\u00e2ncire, cuplare conduct\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrarea nerealizat\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">4.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">fos\u0103 baie \u2013 s\u0103pare groap\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrare finalizat\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211; AoC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">5.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">fos\u0103 baie \u2013 zid\u0103rie, turnare beton sau prefabricate<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrare finalizat\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211; AoC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">6.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">\u0219an\u021b-conduct\u0103 grajd-baie-fos\u0103 strad\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\">&#8211; lucrarea nerealizat\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\"><\/td>\n<td colspan=\"3\" valign=\"top\" width=\"604\"><\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\"><b>\u00a0<\/b><\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\"><strong>Materiale<\/strong><\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"left\"><strong>Cost \u2013 estimare 2013<\/strong><b><\/b><\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\"><strong>Observa\u0163ii \/ raport activit\u0103\u021bi 2013<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">1.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">7 tone piatr\u0103<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"right\">500<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211; 840 &#8211; a fost achizi\u021bionat\u0103 o cantitate mare de piatr\u0103 spart\u0103 pentru realizarea drenului fosei ecologice<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">2.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">5 tone nisip<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"right\">1000<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211; 600 \u2013 suplimentar a fost necesar nisip pentru montarea fosei ecologice; 70% din cantitate a r\u0103mas pentru activit\u0103\u021bi viitoare<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">3.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">1 ton\u0103 var past\u0103<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"right\">500<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211; 2000 \u2013 4 t var past\u0103 \u2013 a fost achizi\u021bionat materialul necesar zidirii bol\u021bi<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">4.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\u0219indril\u0103<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"right\">7500<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211; 7500 \u2013 au fost achizi\u021bionate 7500 buc\u0103\u021bi \u0219indril\u0103<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">5.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">piatr\u0103 repara\u021bii mauri<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"right\">500<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211; 0 \u2013 a fost folosit\u0103 piatr\u0103 recuperat\u0103<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">6.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">instala\u021bii \u2013 canalizare<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"right\">0<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211; 500 \u2013 suplimentar achizi\u021bionate materiale pentru drenul fosei ecologice; materiale instala\u021bie canalizare<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">7.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">Sistem fos\u0103 ecologic\u0103<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"right\">2000<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211; 2000 \u2013 fos\u0103 ecologic\u0103 ECO 6<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\"><b>\u00a0<\/b><\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\"><b>Manoper\u0103<\/b><\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"right\"><b>Cost <\/b><strong>\u2013<\/strong><b> estimare 2013<\/b><\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\"><b>\u00a0<\/b><strong>Observa\u0163ii \/ raport activit\u0103\u021bi 2013<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\"><b>\u00a0<\/b>1.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">me\u0219ter \u0219indrilar,\u00a0 t\u00e2mplar, dulgher, zidar<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"right\">12000<\/p>\n<p align=\"right\">&#8211; 8000 \u2013 cap. II, III, V<\/p>\n<p align=\"right\">&#8211; 4000 \u2013 cap. IV<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211; 8000 \u2013 a fost contractat\u0103 activitatea de montare a \u0219indrilei<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">2.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">muncitori specializa\u0163i \u2013 2 persoane \u2013 2 luni \u2013 2250\/lun\u0103<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"right\">9000<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">\u00a0&#8211; 0 \u2013 nu au fost realizate o parte din lucr\u0103ri (dona\u021biile str\u00e2nse nu au fost suficiente)<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">3.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\">muncitori necalifica\u0163i (voluntari) \u2013 12 persoane \u2013 10 zile (grupuri de 2 voluntari)<\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"right\">0<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211; 37 voluntari AoC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p align=\"left\">4.<\/p>\n<\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\"><strong>asisten\u021b\u0103 de specialitate<\/strong><b><\/b><\/p>\n<\/td>\n<td valign=\"top\" width=\"157\">\n<p align=\"right\">0<\/p>\n<\/td>\n<td valign=\"top\" width=\"254\">\n<p align=\"left\">&#8211; 2 speciali\u0219ti ARA au asigurat voluntar coordonarea \u0219i asisten\u021ba lucr\u0103rilor<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\"><\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\"><strong>Cheltuieli totale (materiale, manoper\u0103)<\/strong><\/p>\n<\/td>\n<td colspan=\"2\" valign=\"top\" width=\"411\">\n<p align=\"right\"><b>21440<\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\"><\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\"><strong>Cheltuieli mas\u0103 voluntari<\/strong><\/p>\n<\/td>\n<td colspan=\"2\" valign=\"top\" width=\"411\">\n<p align=\"right\"><b>1875<\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\"><\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\"><strong>Organizare de \u0219antier<\/strong><\/p>\n<\/td>\n<td colspan=\"2\" valign=\"top\" width=\"411\">\n<p align=\"right\"><b>550<\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\"><\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\"><strong>Dona\u021bii AoC (inclusiv fonduri AFCN)<\/strong><\/p>\n<\/td>\n<td colspan=\"2\" valign=\"top\" width=\"411\">\n<p align=\"right\"><b>29827<\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\"><\/td>\n<td valign=\"top\" width=\"193\">\n<p align=\"left\"><strong>Sold<\/strong><\/p>\n<\/td>\n<td colspan=\"2\" valign=\"top\" width=\"411\">\n<p align=\"right\"><b>5962<\/b><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sajnos ennek a bejegyz\u00e9snek csak Rom\u00e1n nyelv\u0171 v\u00e1ltozata van. Lucr\u0103rile s-au concentrat \u00een direc\u021bia realiz\u0103rii infrastructurii \u0219i a lucr\u0103rilor prioritare \u2013 finalizarea zidului pr\u0103bu\u0219it, ridicarea construc\u021biei pe zidul ref\u0103cut (structura de lemn era alunecat\u0103 \u0219i \u00eenclinat\u0103) \u0219i preg\u0103tirea lucr\u0103rilor pentru realizarea acoperi\u0219ului. Capitolele de lucr\u0103ri propuse pentru finan\u021bare \u2013 Raport 2013 \u00a0 Materiale observa\u021bii sursa &#8230;<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_mi_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"aoc_link":""},"categories":[7],"tags":[],"_links":{"self":[{"href":"https:\/\/www.adoptaocasa.ro\/hu\/wp-json\/wp\/v2\/posts\/1320"}],"collection":[{"href":"https:\/\/www.adoptaocasa.ro\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.adoptaocasa.ro\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.adoptaocasa.ro\/hu\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.adoptaocasa.ro\/hu\/wp-json\/wp\/v2\/comments?post=1320"}],"version-history":[{"count":10,"href":"https:\/\/www.adoptaocasa.ro\/hu\/wp-json\/wp\/v2\/posts\/1320\/revisions"}],"predecessor-version":[{"id":1540,"href":"https:\/\/www.adoptaocasa.ro\/hu\/wp-json\/wp\/v2\/posts\/1320\/revisions\/1540"}],"wp:attachment":[{"href":"https:\/\/www.adoptaocasa.ro\/hu\/wp-json\/wp\/v2\/media?parent=1320"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.adoptaocasa.ro\/hu\/wp-json\/wp\/v2\/categories?post=1320"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.adoptaocasa.ro\/hu\/wp-json\/wp\/v2\/tags?post=1320"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}